service01@nanomet-sales.com   |   0086-(0)757-83128353
News
Location: Home > About Us > News

NANOMET ROOF SHEET maintenance precautions

Published date: 2023/4/5

industrial metal roofing

Protective Film: To prevent scratches during shipping and installation, the NANOMET ROOF SHEET is coated with a protective film on the surface of the product. Remove the protective film as soon as possible after installation. It is recommended that the protective film be removed within 6 weeks from the date of completion of installation.

steel metal roofing

 
Surface Scratches: If a NANOMET ROOF SHEET has a small surface scratch during installation, a new passivation layer is regenerated due to the self-healing nature of its roofing sheeting. But if the scratch is deep and wide, consider replacing the plate.
Grease and dust: If grease and dust accumulates on the surface of the roof panel during installation, it can be gently wiped off with a clean and dry cloth, do not rub hard or use cleaning products. Dust can be washed away naturally by rain.

ridge cap for corrugated metal roof

 
Fingerprint printing: When NANOMET ROOF SHEET is applied to the curtain wall, attention should be paid to the fingerprint problem. To remove them, mineral oil is needed. Of course, in order to prevent fingerprints fundamentally, it is best to wear cotton gloves when installing.
Contact:NANOMET
Tel:0086-(0)757-83128353
mail:
service01@nanomet-sales.com

NANOMET ROOF SHEET 20230405909

Share to:

SIGN UP NEWSLETTER
FOLLOW US
Copyright © NANOMET-SALES LIMITED All Rights Reserved.   Sitemap   XML